PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed waste and vent piping at the 1st floor going into the 2nd floor bathrooms Facing East.jpg Finished installing the steel angles and the metal decking at the roof Facing East.jpg Metal framing at the Courtroom 461 Facing South.jpg Started installing sheat rock at the lower roof Facing South.jpg Welding clips at the 4th floor North Elevation.jpg
Previous page Welding clips at the 4th floor North Elevation
Welding clips at the 4th floor North Elevation